[110] Hybrid NSGA-II Algorithm for an Imperfect Production System Considering Product Quality and Returns under Two Warranty Policies
A.A. Taleizadeh, P. Pourreza, and I.k. Moon
Applied Soft Computing (Accepted)

[109] Wartime logistics model for multi-support unit location-allocation problem with front line changes
H.J. Koo and I.K. Moon
International Transactions in Operational Research (Accepted)

[108] Traveling Salesman Problem with a Drone Station
S.W. Kim and I.K. Moon
IEEE Transactions on Systems, Man and Cybernetics: Systems (Accepted)

[107] Joint Pricing and Inventory Decisions with Carbon Emission Considerations, Partial Backordering and Planned Discounts
A.A. Taleizadeh, B. Hazarkhani, and I.K. Moon
Annals of Operations Research (Accepted)

[106] Investment and Coordination Decisions in a Supply Chain of Fresh Agricultural Products
I.K. Moon, Y.J. Jeong, and S. Saha
Operational Research (Accepted)

[105] Balancing a Mixed-model Assembly Line with Unskilled Temporary Workers: Algorithm and Case Study
D.W. Kim, D.H. Moon, and I.K. Moon
Assembly Automation (Accepted)

[104] Medical Relief Shelter Location Problem with Patient Severity under a Limited Relief Budget
J.M. Gu, Y. Zhou, A. Das, I.K. Moon, and Gyu M. Lee
Computers and Industrial Engineering (Accepted)

[103] Task Scheduling System for UAV Operations in Indoor Environment
Y. Khosiawan, Y.S. Park, I.K. Moon, J.M. Nilakanta, and I. Nielsen
Neural Computing and Applications (Accepted)

[102] Network Repair Crew Scheduling for Short-Term Disasters
S.W. Kim, Y.C. Shin, G. Lee, and I.K. Moon
Applied Mathematical Modelling (2018.12) Vol. 64 pp.510-523

[101] Range-based Truck-state Transition Modeling Method for Foldable Container Drayage Services
R. Zhang, H. Zhao, and I.K. Moon
Transportation Research Part E (2018.10), Vol. 118, pp.225-239

[100] Direct Shipping Service Routes with an Empty Container Management Strategy
Y.J. Jeong, S. Saha, D. Chatterjee, and I.K. Moon
Transportation Research Part E (2018.10), Vol. 118, pp.123-142

[99] Early Stage Response Problem for Post-Disaster Incidents
S.W. Kim, Y.C. Shin, G. Lee, and I.K. Moon
Engineering Optimization (2018.07), Vol. 50, Issue 7, pp. 1198-1211

[98] Optimization of Prices, Quality Levels, and Collection Decisions in a Decentralized Closed-loop Supply Chain with Different Channel Structures : Game Theoretical Approach
A.A. Taleizadeh, M.S. Moshtagh, and I.K. Moon
Journal of Cleaner Production (2018.07), Vol. 189, pp.406-431

[97] The Impact of Online Sales in Centralized and Decentralized Dual-channel Supply Chains
I.K. Moon, S. P. Sarmah, and S. Saha
European Journal of Industrial Engineering (2018.02), Vol. 12, No. 1, pp.67-92

[96] Strategic Inventory: Manufacturer vs. Retailer Investment
I.K. Moon, K. Dey, and S. Saha
Transportation Research Part E (2018.01), Vol. 109, pp. 63-82

[95] Supply Chain Coordination with a Single Supplier and Multiple Retailers considering Customer Arrival Times and Route Selection
I.K. Moon, and X. Feng
Transportation Research Part E (2017.10), Vol. 106, pp. 78-97

[94] Joint Decisions on Product Line Selection, Purchasing, and Pricing
I.K. Moon, K.S. Park, J. Hao, and D.W. Kim
European Journal of Operational Research (2017.10), Vol. 262, Issue 1, pp. 207-216

[93] Optimal Decisions of Price, Quality, Effort Level, and Return Policy in a Three-level Closed-loop Supply Chain based on Different Game Theory Approaches
A. Taleizadeh, M. Moshtagh, and I.K. Moon
European Journal of Industrial Engineering (2017.08), Vol. 11, No. 4, pp. 486-525

[92] Warehouse Capacity Sharing via Transshipment for an Integrated Two-echelon Supply Chain
X. Feng, I.K. Moon, and K.R. Ryu
Transportation Research Part E (2017.08), Vol. 104, pp. 17-35

[91] An Integer Program and a Hybrid Genetic Algorithm for the University Timetabling Problem
X. Feng, Y. Lee, and I.K. Moon
Optimization Methods and Software (2017.04) Vol. 32, No. 3, pp. 625-649

[90] Optimal Retailer Investments in Green Operations and Preservation Technology for Deteriorating Items
S. Saha, I. Nielsen, and I.K. Moon
Journal of Cleaner Production (2017.01), Vol. 140, Part 3, pp. 1514-1527

[89] Fuzzy Bi-objective Production-Distribution Planning Problem under the Carbon Emission Constraint
I.K. Moon, Y.J. Jeong, and S. Saha
Sustainability (2016.08), Vol. 8, Issue 8, 17pages

[88] The Distribution-free Newsboy Problem with Multiple Discounts and Upgrades
I.K. Moon, D.K. Yoo, and S. Saha
Mathematical Problems in Engineering (2016), Vol. 2016, Article ID 2017253, 11pages

[87] Multi-Depot Vehicle Routing Problem with Time Windows considering Delivery and Installation Vehicles
H.C. Bae and I.K. Moon
Applied Mathematical Modelling (2016.07), Vol. 40, Issue 13-14, pp. 6536-6549

[86]A Time-varying Lot Sizes Approach for the Economic Lot Scheduling Problem with Returns
H.C. Bae, I.K. Moon and W.Y. Yun
International Journal of Production Research (2016.06), Vol. 54, Issue 11, pp. 3380-3396

[85] Evolutionary Resource Assignment for Workload-based Production Scheduling
I.K. Moon, S.H, Lee, M.S. Shin and K.Y. Ryu
Journal of Intelligent Manufacturing (2016.04), Vol. 27, Issue 2, pp. 375-388

[84] Dual channel closed-loop supply chain coordination with a reward-driven remanufacturing policy
S. Saha, S.P. Sarmah and I.K. Moon
International Journal of Production Research (2016.03), Vol. 54, Issue 5, pp. 1503-1517

[83] Repositioning of Empty Containers using both Standard and Foldable Containers
I.K. Moon and H.J. Hong
Maritime Economics and Logistics (2016.03), Vol. 18, No.1, pp. 61-77

[82] Supply Chain Coordination under Budget Constraints
X. Feng, I.K. Moon and K. Ryu
Computers and Industrial Engineering (2015.10),Vol. 88, pp. 487-500

[81] Hybrid Genetic Algorithms for the Three-dimensional Multiple Container Packing Problem
X. Feng, I.K. Moon and J.H. Shin
Flexible Services and Manufacturing Journal (2015.09),Vol. 27, Issue 2-3, pp. 451-477

[80] Channel Coordination for Multi-stage Supply Chains with Revenue-sharing Contracts under Budget Constraints
I.K. Moon, X. Feng and K.Y. Ryu
International Journal of Production Research (2015.08),Vol. 53, Issue 16, pp. 4819-4836

[79] A Combined Tramp Ship Routing, Fleet Deployment, and Network Design Problem
I.K. Moon, Z.B. Qiu and J.H. Wang,
Maritime Policy and Management (2015.01),Vol. 42, Issue 1, pp. 68-91

[78] Manufacturing Setup Cost Reduction and Quality Improvement for the Distribution Free Continuous-review Inventory Model with a Service Level Constraint
B. Sarkar, K. Chaudhuri, I.K. Moon
Journal of Manufacturing Systems (2015.01),Vol. 34, Issue 1, pp. 74-82

[77] Labour Productivity in Modular Assembly: A Study of Automotive Module Suppliers
N. Islamoglu, K. Ryu, and I.K. Moon
International Journal of Production Research (2014.12),Vol. 52, No. 23, pp. 6954-6970

[76] Container Packing Problem with Balance Constraints
I.K. Moon and N.T.V. Ly
OR Spectrum (2014.10), Vol. 36, No. 4, pp. 837-878

[75] A Network Flow Model for the Optimal Allocation of both Foldable and Standard Containers
Y. Myung and I.K. Moon
Operations Research Letters (2014.09), Vol. 42, Issues 6-7, pp. 484-488

[74] Improved Quality, Setup Cost Reduction, and Variable Backorder Costs in an Imperfect Production Process
B. Sarkar and I.K. Moon
International Journal of Production Economics (2014.09), Vol. 155, pp. 204-213

[73] A Hybrid Hub-and-Spoke Postal Logistics Network with Realistic Restrictions: A Case Study of Korea Post
J.H. Lee and I.K. Moon
Expert Systems With Applications (2014.09), Vol. 41, pp. 5509-5519

[72] Planning of Business Process Execution in Business Process Management Environments
H.R. Bae, S.H. Lee and I.K. Moon
Information Sciences (2014.06), Vol. 268, No. 1, pp. 357-369

[71] Modeling and Optimization of Energy Efficient Routing in Wireless Sensor Networks
J.H. Lee and I.K. Moon
Applied Mathematical Modelling (2014.04), Vol. 38, No. 7-8, pp. 2280-2289

[70] Economic Lot and Supply Scheduling Problem: A Time-varying Lot Sizes Approach
H.C. Bae, I.K. Moon and W.Y. Yun
International Journal of Production Research (2014.04), Vol. 52, No. 8, pp. 2422-2435

[69] Hybrid Genetic Algorithms for Test Bed Scheduling Problems
A.D. Do Ngoc, S.H. Lee and I.K. Moon
International Journal of Production Research (2014.02), Vol. 52, No. 4, pp. 1074-1089

[68] Min-max Distribution Free Continuous-review Model with a Service Level Constraint and Variable Lead Time
I.K. Moon, E.J. Shin and B. Sarkar
Applied Mathematics and Computation (2014.02),Vol. 229, pp. 310-315

[67] Revenue-sharing Contracts in an N-stage Supply Chain with Reliability Considerations
X. Feng, I.K. Moon and K. Ryu
International Journal of Production Economics (2014.01), Vol. 147, Part A, pp. 20-29

[66] A Pick-up and Delivery Service Network Design among Service Centers for Low Demands in Express Delivery Services
F. N. Ferdinand, I.K. Moon, and C.S. Ko
ICIC Express Letters (2013.06), Vol. 7, No. 6, pp. 1819-1825

[65] A Decision Making Model for Strategic Alliance-based Network Design in Express Delivery Services
F. N. Ferdinand, I.K. Moon, K.H. Chung, and C.S. Ko
ICIC Express Letters (2013.06), Vol. 7, No. 6, pp. 1813-1818

[64] A Fractal Echelon Approach for Inventory Management in Supply Chain Networks
K.Y. Ryu, I.K. Moon, S.J. Oh and M.Y. Jung
International Journal of Production Economics (2013.06), Vol. 143, No. 2, pp. 316-326

[63] Foldable and Standard Containers in Empty Container Repositioning
I.K. Moon, A.D. Do Ngoc and R. Konings
Transportation Research Part E (2013.01), Vol. 49, No. 1, pp. 107-124

[62] Vehicle Routing Problem with Time Windows considering Overtime and Outsourcing Vehicles
I.K. Moon, J.H. Lee and J. Seong
Expert Systems With Applications (2012.12), Vol. 39, No. 18, pp. 13202-13213

[61] A Hybrid Genetic Algorithm with a new Packing Strategy for the Three-dimensional Bin Packing Problem
K.D. Kang, I.K. Moon and H.F. Wang
Applied Mathematics and Computation (2012.10), Vol. 219, No. 3, pp. 1287-1299

[60] A Memetic Particle Swarm Optimization Algorithm for Multimodal Optimization Problems
H.F. Wang, I.K. Moon, S.X. Yang and D.W. Wang
Information Sciences (2012.08), Vol. 197, No. 15, pp. 38-52

[59] Flexible Job-shop Scheduling Problems with ‘AND’/‘OR’ Constraints
S.H. Lee, I.K. Moon, H.R. Bae and J.O. Kim
International Journal of Production Research (2012.04), Vol. 50, No. 7, pp. 1979-2001

[58] Inventory Systems with Variable Capacity
I.K. Moon, B.H. Ha and J.C. Kim
European Journal of Industrial Engineering (2012.01), Vol. 6, No. 1, pp.68-86

[57] The Storage Capacity Expansion and Space Leasing for Container Depots
A.D. Do Ngoc and I.K. Moon
Flexible Services and Manufacturing Journal (2011.10), Vol. 23, No. 4, pp.364-384

[56] Modeling and Optimization of a Container Drayage Problem with Resource Constraints
R. Zhang, W.Y. Yun and I.K. Moon
International Journal of Production Economics (2011.09), Vol. 133, No. 1, pp.351-359

[55] The Joint Replenishment and Freight Consolidation of a Warehouse in a Supply Chain
I.K. Moon, B.C. Cha and C.U. Lee
International Journal of Production Economics (2011.09), Vol. 133, No. 1, pp.344-350

[54] An EPQ Model with Inflation in an Imperfect Production System
B. Sarkar and I.K. Moon
Applied Mathematics and Computation (2011.03), Vol. 217, No. 13, pp.6159-6167

[53] Collaborative Fractal-based Supply Chain Management Based on a Trust Model for the Automotive Industry
S.J. Oh, K.Y. Ryu, I.K. Moon, H.B. Cho and M.Y. Jung
Flexible Services and Manufacturing Journal (2010.12), Vol.22, No. 3-4, pp.183-213

[52] Positioning Empty Containers among Multiple Ports with Leasing and Purchasing Considerations
I.K. Moon, A.D. Do Ngoc and Y.S. Hur
OR Spectrum (2010. 07), Vol. 32, No. 3, pp.765-786

[51] Multi-level Supply Chain Network Design with Routing
J.H. Lee, I.K. Moon and J.H. Park
International Journal of Production Research (2010. 07), Vol. 48, No. 13, pp.3957-3976

[50] A Reactive Tabu Search Algorithm for the Multi-Depot Container Truck Transportation Problem
R. Zhang, W.Y. Yun and I.K. Moon
Transportation Research Part E (2009. 11), Vol. 45, No. 6, pp.904-914

[49] Integrated Assembly Line Balancing with Resource Restrictions
I.K. Moon, R. Logendran and J.H. Lee
International Journal of Production Research (2009. 10), Vol. 47, No. 19, pp.5525-5541

[48] Offsetting Inventory Cycles using Mixed Integer Programming and Genetic Algorithm
I.K. Moon, B.C. Cha and S.K. Kim
International Journal of Industrial Engineering (2008. 09), Vol. 15, No. 3, pp. 245-256

[47] The Joint Replenishment and Delivery Scheduling of the One-Warehouse, n-Retailer System
B.C. Cha, I.K. Moon and J.H. Park
Transportation Research Part E (2008. 09), Vol. 44, Issue 5, pp. 720-730

[46] Analytic Hierarchy Process to Assess and Optimize Distribution Network
Mithun J. Sharma, I.K. Moon and H.R. Bae
Applied Mathematics and Computation (2008, 08), Vol. 202, Issue 1, pp. 256-265

[45] Simulation-based Maintenance Support System for Multi-functional Complex Systems
W. Yun, I.K. Moon and G. Kim
Production Planning & Control (2008. 06), Vol. 19, Issue 4, pp. 365-378

[44] The Joint Replenishment Problem Involving Multiple Suppliers Offering Quantity Discounts
I.K. Moon, S.K. Goyal and B.C. Cha
International Journal of Systems Science (2008. 06), Vol. 39, Issue 6, pp. 629-637

[43] Genetic Algorithms for Job Shop Scheduling Problems with Alternative Routings
I.K. Moon, S.H. Lee and H.R. Bae
International Journal of Production Research (2008. 05), Vol. 46, No. 10, pp. 2695-2705

[42] Hybrid Genetic Algorithm for Group Technology Economic Lot Scheduling Problem
I.K. Moon, B.C. Cha and H.C. Bae
International Journal of Production Research (2006. 11), Vol. 44, No. 21, pp. 4551-4568

[41] The Joint Replenishment Problem with Resource Restriction
I.K. Moon and B.C. Cha
European Journal of Operational Research (2006. 08), Vol. 173, Issue 1, pp. 190-198

[40] Coordinated Inventory Models with Compensation Policy in a Three Level Supply Chain
J.H. Lee and I.K. Moon
Lecture Notes in Computer Science (2006. 05), Vol. 3982, pp. 572-581

[39] A Simple Heuristic on a Multi-product Inventory System with Budgetary Constraint
S.K. Goyal, B.C. Giri and I.K. Moon
Industrial Engineering Journal (2006. 04), Vol. 35, No. 4, pp. 17-19

[38] The Joint Replenishment Problem with Quantity Discounts under Constant Demand
B.C. Cha and I.K. Moon
OR Spectrum (2005. 08), Vol. 27, No. 4, pp. 569-581

[37] A Continuous Review Inventory Model with the Controllable Production Rate of the Manufacturer
I.K. Moon and B.C. Cha
International Transactions in Operational Research (2005. 06), Vol. 12, pp. 247-258

[36] Economic Order Quantity Models for Ameliorating/Deteriorating Items under Inflation and Time Discounting
I.K. Moon, B.C. Giri and B. Ko
European Journal of Operational Research (2005. 05), Vol. 162, Issue 3, pp. 773-785

[35] Note on an Economic Lot Scheduling Problem under Budgetary and Capacity Constraints
B.C. Giri and I.K. Moon
International Journal of Production Economics (2004. 10), Vol. 91, No. 3, pp. 229-234

[34] Accounting for Idle Capacity Cost in the Scheduling of Economic Lot Sizes
B.C. Giri and I.K. Moon
International Journal of Production Research (2004. 02), Vol. 42, No. 4, pp. 677-691

[33] Scheduling Economic Lot Sizes in Deteriorating Production Systems
B.C. Giri, I.K. Moon, W.Y. Yun
Naval Research Logistics (2003. 09), Vol. 50, No. 6, pp. 650-661

[32] Economic Lot Scheduling Problem with Imperfect Production Processes and Setup Times
I.K. Moon, B.C. Giri and K. Choi
Journal of the Operational Research Society (2002. 06), Vol. 53, pp. 620-629

[31] Hybrid Genetic Algorithm for the Economic Lot-Scheduling Problem
I.K. Moon, E. Silver and S. Choi
International Journal of Production Research (2002. 03), Vol. 40, No. 4, pp. 809-824

[30] Book Review: Inventory Management and Production Planning and Scheduling, third editon
I.K. Moon
Interfaces (2001. 11), Vol. 35, Issue 6, pp. 125-127

[29] Comment on Boss S, Goswami A and Chaudhuri KS(1995). An EOQ Model for Deteriorating Items with Linear Time-dependent Demand Rate and Shortages under Inflation and Time Discounting
I.K. Moon and B.C Giri
Journal of the Operational Research Society (2001. 08), Vol. 52, pp. 966-969

[28] The Multi-Item Single Period Problem with an Initial Stock of Convertible Units
E. Silver and I.K. Moon
European Journal of Operational Research (2001. 07), Vol. 132, Issue 2, pp. 466-477

[27] Multi-Item Economic Order Quantity Model with an Initial Stock of Convertible Units
E. Silver and I.K. Moon
The Engineering Economist (2001. 06), Vol. 46, No. 2, pp. 129-138

[26] Minimizing the Expected Total Value of Shortages for a Population of Items Subject to Practical Restrictions on the Reorder Points
I.K. Moon and E. Silver
International Journal of Production Economics (2001. 03), Vol. 70, No. 1, pp. 45-54

[25] The Effects of Inflation and Time-Value of Money on an Economic Order Quantity Model with a Random Product Life Cycle
I.K. Moon and S. Lee
European Journal of Operational Research (2000. 09), Vol. 125, Issue 3, pp. 588-601

[24] The Multi-Item Newsvendor Problem with a Budget Constraint and Fixed Ordering Costs
I.K. Moon and E. Silver
Journal of the Operational Research Society (2000. 05), Vol. 51, pp. 602-608

[23] A Fast Heuristic for Minimizing Total Average Cycle Stock Subject to Practical Constraints
E. Silver and I.K. Moon
Journal of the Operational Research Society (1999. 08), Vol. 50, pp. 789-796

[22] The Effect of the Stabilization Period on The Economic Lot Scheduling Problem
I.K. Moon, J. Hahm, and C. Lee
IIE Transactions (1998. 11), Vol. 30, No. 11, pp. 1009-1017

[21] A Note on Lead Time and Distributional Assumptions in Continuous Review inventory Models
I.K. Moon and S. Choi
Computers & Operations Research (1998. 11), Vol. 25, No. 11, pp. 1007-1012

[20] Rationing Policies for Some Inventory Systems
I.K. Moon and S. Kang
Journal of the Operational Research Society (1998. 04), Vol. 49, No. 5, pp. 509-518

[19] Warranty Cost Analysis under Continuous Sales
W. Yun and I.K. Moon
Journal of the Operational Research Society (1998. 02), Vol. 49, No. 2, pp. 176-178

[18] The Distribution Free Job Control Problem
I.K. Moon and W. Yun
Computers & Industrial Engineering (1997. 01), Vol. 32, No. 1, pp. 109-113

[17] Distribution Free Procedures for Make-to-Order(MTO), Make-in-Advance(MIA), and Composite Policies
I.K. Moon and S. Choi
International Journal of Production Economics (1997. 01), Vol. 48, No. 1, pp. 21-28

[16] System Analysis of a Multi-Product, Small-Lot-Sized Production by Simulation : A Korean Motor Factory Case
K. Cho, I.K. Moon and W. Yun
Computers & Industrial Engineering (1996. 06), Vol. 30, No 3, pp. 347-356

[15] How to Avoid Stockouts When Producing Several Items on a Single Facility? What to Do if You Can't?
G. Galllego and I.K. Moon
Computers & Operations Research (1996. 01), Vol. 23, No. 1, pp. 1-12

[14] Strategic Investment to Reduce Setup Time in the Economic Lot Scheduling Problem
G. Galllego and I.K. Moon
Naval Research Logistics (1995. 08), Vol. 42, No. 5, pp. 773-790

[13] The Distribution Free Newsboy Problem with Balking
I.K. Moon and S. Choi
Journal of the Operational Research Society (1995. 04), Vol. 46, No. 4, pp. 537-542

[12] Generalized Fomula for the Periodic Geometric-Gradient Series Payment in a Skip Payment Loan with Arbitrary Skips
I.K. Moon
The Engineering Economist (1994. 12), Vol. 39, No. 2, pp. 177-185

[11] The Distribution Free Continuous Review Inventory System with a Service Level Constraint
I.K. Moon and S. Choi
Computers & Industrial Engineering (1994. 09), Vol. 27, No. 1, pp. 209-212

[10] Multiproduct Economic Lot Size Models with Investment Costs for Setup Reduction and Quality Improvement : Review and Extensions
I.K. Moon
International Journal of Production Research (1994. 12), Vol. 32, No. 12, pp. 2795-2801

[9] Distribution Free Procedures for Some Inventory models
I.K. Moon and G. Gallego
Journal of the Operational Research Society (1994. 06), Vol. 45, No. 6, pp. 651-65

[8] Optimal Control of a Manufacturing Process that Involves Trial Runs
G. Gallego, D. Yao and I.K. Moon
Management Science (1993. 12), Vol. 39, No. 12, pp. 1499-1505

[7] An Economic Order Quantity Model with a Random Planning Horizon
I.K. Moon and W. Yun
The Engineering Economist (1993. 09), Vol. 39, No. 1, pp. 77-86

[6] A Note on Evaluating Investments in Inventory System : A Net Present Value Framework
I.K. Moon and W. Yun
The Engineering Economist (1993. 09), Vol. 39, No. 1, pp. 93-99

[5] A Note of Correction on Multi-Product Scheduling on a Single Machine
I.K. Moon
Omega (1993. 09), Vol. 21, No. 5, pp. 597-599

[4] The Distribution Free Newsboy Problem : Review and Extensions
G. Gallego and I.K. Moon
Journal of the Operational Research Society (1993. 08), Vol. 44, No. 8, pp. 825-834

[3] A Note on Impact to Investing in Quality Improvement on the Lot Size Model
I.K. Moon
Omega (1992. 07), Vol. 20, No. 4, pp. 545

[2] The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
G. Galllego and I.K. Moon
Operations Research (1992. 05), Vol. 40, No. 3, pp. 614-619

[1] Controllable Production Rates in a Family Production Context
I.K. Moon, G. Gallego and D. Simchi-Levi
International Journal of Production Research (1991. 12), Vol. 29, No. 12, pp. 2459-2470