The Optimal Two Stages Lot Sizing Problem with An Unreliable Machine Àü ¿îÁ¤ This paper considers the two-stage lot-sizing problem with an unreliable machine.
The production rate at the first stage is greater than that at the second stage and
the transfer from the first stage to the second stage is continuous. The problem
was classified according to: whether the lot size at the first stage is greater or less
than that at the second stage. Lot sizing and batch models often assume reliable
manufacturing facilites. But in this paper, we focus on the effects of the breakdown
of machine at the stage 2. The machine has an exponentially distributed life time,
and the repair time when the machine fails is ignored. |